During the last week of September, Eli toiled in the frigid air, sawing stumps, clearing debris and digging a 120ft long trench from our shed to the new house.
After covereing the wire with a little dirt, a strip of flagging was laid over it, so that if someone should dig in the wrong place in the future, they would hit the flagging first and know that something is up.
Main panel wired up and ready to go. Sub panel, in the house, ready to go.
THE FIRST LIGHT SWITCH!
And.....IT WORKS!!!!!
It's official. We now have electricity!